BS ISO 8528-6:2023
$215.11
Reciprocating internal combustion engine driven alternating current generating sets – Test methods
Published By | Publication Date | Number of Pages |
BSI | 2023 | 74 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | National foreword |
7 | Foreword |
9 | 1 Scope 2 Normative references |
10 | 3 Terms, definitions and abbreviations 3.1 Terms and definitions |
15 | 3.2 Abbreviated terms 4 Other regulations and additional requirements |
16 | 5 General test requirements 5.1 General |
17 | 5.2 Measurement equipment accuracy |
18 | 6 Functional test 6.1 General 6.1.1 General 6.1.2 Physical functional test 6.1.3 Functional test by simulation 6.2 General inspection |
19 | 6.3 Measurements 6.4 Functional test report |
20 | 7 Type test 7.1 General 7.2 Testing conditions |
21 | 7.3 Characterisation of performance class 7.3.1 Steady state verification at constant power |
22 | 7.3.2 Verification of power-sharing capability 7.3.3 Step load test |
24 | 7.3.4 Start and stop time characteristics |
25 | 7.4 Reactive power capability 7.4.1 General 7.4.2 Verification of reactive power capability |
28 | 7.4.3 Test method for verification of reactive power capability control methods |
32 | 7.5 Verification of grid synchronization limits 7.5.1 General 7.5.2 Testing method for verification of grid synchronisation limits |
33 | 7.6 Test method for verification of FRT capability 7.6.1 General 7.6.2 Aim of the test 7.6.3 Documents to be provided before test |
34 | 7.6.4 Test method |
35 | 7.6.5 Acceptance criteria 7.7 Test method for verification of active power response to frequency variation 7.7.1 General 7.7.2 Aim of the test |
36 | 7.7.3 Documents to be provided before test 7.7.4 Test method |
37 | 7.7.5 Acceptance criteria 7.8 Test method for verification of generating set protections 7.8.1 General 7.8.2 Verification of generating set disconnection time from the grid |
38 | 7.8.3 Verification of protection limits |
39 | 8 Simulation-method-based assessment 8.1 General |
40 | 8.2 Specification of model blocks 8.2.1 General 8.2.2 Engine and engine controller or governor block |
41 | 8.2.3 AC generator block 8.2.4 Generating set controller block 8.2.5 Excitation controller (AVR) block 8.2.6 Exciter block 8.2.7 Protective devices block |
42 | 8.2.8 Measurement transformer (if applicable) 8.3 Simulation for ISO performance class in standalone island operation 8.3.1 General 8.3.2 Model validation for standalone island mode |
44 | 8.4 Simulation for generating sets used in grid connected applications 8.4.1 General 8.4.2 Requirements and methodologies for model validation |
45 | 8.4.3 Model validation for different grid requirements |
49 | 8.5 Assessment for generating set family 8.5.1 Methodology 8.5.2 Assessment for ISO performance class for family 8.5.3 Assessment for type test for family in grid parallel application |
50 | 9 Acceptance test 9.1 General 9.2 Responsibility 9.3 Preparation 9.3.1 Provision of auxiliary personnel, test equipment and operating materials |
51 | 9.3.2 Acceptance test preparation at the installation site 9.3.3 Acceptance test preparation at the manufacturer’s site or facility 9.3.4 Preliminary safety checks on generating set prior to testing 9.4 Further details |
52 | 9.5 Extent of acceptance test 9.5.1 General 9.5.2 Checks (C) |
53 | 9.5.3 Measurements (M) |
54 | 9.6 Accuracy of measurement equipment and acceptance test procedure 9.6.1 Measurement equipment accuracy 9.6.2 Warm-up time |
55 | 9.6.3 Generating set load test duration 9.6.4 Performing acceptance tests at the manufacturer’s works 9.6.5 Installation site acceptance test |
56 | 9.7 Acceptance test report 9.7.1 General 9.7.2 General data |
58 | 9.7.3 Additional measured data for acceptance test |
59 | Annex A (informative) Test method using OVRT/UVRT test equipment |
66 | Annex B (informative) Test method for frequency ride through requirements |
71 | Annex C (informative) Example load step test report |
73 | Bibliography |