BSI 20/30416719 DC:2020 Edition
$13.70
BS 5839-9. Fire detection and fire alarm systems for buildings – Part 9. Code of practice for the design, installation, commissioning and maintenance of emergency voice communication systems
Published By | Publication Date | Number of Pages |
BSI | 2020 | 66 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | 30416719.PDF |
3 | 30416719_Text.pdf |
7 | Introduction |
8 | Section 1: General 1 Scope 2 Normative references |
9 | 3 Terms and definitions 3.1 access level 3.2 competent person 3.3 disabled refuge system 3.4 duplex operation |
10 | 3.5 emergency voice communication system 3.6 evacuation lift 3.7 EVC mode 3.8 firefighting lobby 3.9 firefighting stair 3.10 fire telephone system 3.11 group call 3.12 handset 3.13 hook-switch 3.14 intelligibility 3.15 master station 3.16 non-EVC mode 3.17 off-hook 3.18 on-hook |
11 | 3.19 on hold 3.20 outstation 3.21 phased evacuation 3.22 protected lobby/corridor 3.23 protected stairway 3.24 refuge 3.25 stewards’ telephone system 3.26 VSWR 3.27 wireless link budget 3.28 wireless repeater 4 Need for an emergency voice communication system |
12 | 5 Exchange of information and definition of responsibilities |
13 | 6 Variations from the recommendations of this British Standard |
15 | Section 2: Design considerations 7 Purpose |
16 | 8 System circuitry and software |
17 | 9 Audio and data signal paths |
18 | 10 Fault monitoring and indication 10.1 Fault conditions 10.2 Fault indications |
19 | 10.3 Audible fault warning 10.4 Resetting from the fault warning condition 10.5 Monitoring of software-controlled equipment |
20 | 10.6 Monitoring of memory contents 10.7 System integrity |
21 | 11 Outstations 11.1 General 11.2 Controls |
22 | 11.3 Indications 11.4 Electrical performance |
23 | 11.5 Mechanical details |
24 | 11.6 Location |
25 | 11.7 Audio frequency induction loop systems |
27 | 12 Master stations 12.1 General |
28 | 12.2 Controls |
29 | 12.3 Indicators |
30 | 12.4 Electrical performance |
31 | 12.5 Mechanical construction 12.6 Location |
33 | 13 Power supplies 13.1 Recommendations for mains power supplies |
34 | 13.2 Recommendations for EVC system power supply units |
36 | 14 Cables, wiring and other interconnections |
38 | 15 Wireless-linked EVC systems |
41 | 16 Environmental conditions 17 Electromagnetic compatibility |
42 | 18 Electrical safety |
43 | Section 3: Installation 19 Responsibility of installer 20 Installation practices and workmanship |
44 | 21 Testing of wiring |
45 | Section 4: Commissioning and handover 22 Commissioning |
46 | 23 Documentation |
47 | 24 Certification |
48 | 25 Acceptance 26 Verification |
49 | 27 Training |
50 | Section 5: Maintenance 28 Routine testing 28.1 Recommendations for weekly testing by the user 28.2 Recommendations for monthly attention by the user 29 Inspection and servicing 29.1 Recommendation for quarterly inspection of a vented battery |
51 | 29.2 Recommendations for six-monthly inspection and test of the system 30 Non-routine attention |
54 | Section 6: User responsibilities 31 Responsible person 32 Logbook |
55 | Annex A (informative) Explanation of access level A.1 General A.2 Access level 1 A.3 Access level 2 A.4 Access level 3 A.5 Access level 4 |
56 | Annex B (normative) Method for calculating standby battery capacity Annex C (normative) Modified subclauses from BS EN 54-2:1997+A1:2006 |
58 | Annex D (informative) Model certificates |