BSI PD IEC/TS 62647-4:2018
$167.15
Process management for avionics. Aerospace and defence electronic systems containing lead-free solder – Ball grid array (BGA) re-balling
Published By | Publication Date | Number of Pages |
BSI | 2018 | 44 |
This part of IEC 62647, which is a Technical Specification, defines the requirements for replacing solder balls on ball grid array (BGA) component packages in the context of an electronic components management plan (ECMP) for aerospace, defence and high reliability products.
NOTE 1 IEC TS 62239-1 and EIA-STD-4899 describe the electronic components management program (ECMP).
It does not apply to column grid array (CGA) components or chip scale components.
This re-balling document addresses two types of configurations. For other configuration types, see Annex A for tailoring.
-
Configuration 1: A BGA package that will be de-balled and then re-balled with tin-lead balls compatible with a tin-lead soldering assembly process.
-
Configuration 2: A BGA package that will be de-balled and then re-balled with Pb-free balls compatible with a Pb-free soldering assembly process.
The intent of this document is to provide re-balling companies (hereinafter referred to as the re-balling provider) with the administrative and technical requirements to be incorporated within existing processes or for establishing, implementing and maintaining a new set of processes or the creation of a stand-alone re-balling process.
This document is intended to be used by de-balling/re-balling providers and customers, typically avionics original equipment manufacturers (OEM); it defines the requirements for re-balling providers who are providing services to the aerospace, defence, high performance and high reliability electronics industry.
Requirements for new BGA component part number qualification are also included. This document identifies the need for the creation of new part numbers for re-balled BGA components, covers process and testing requirements for the de-balling/re-balling process and encourages the automated processes due to the ability to control the process.
Companies engaged in re-balling are supposed to have the necessary knowledge, experience and tools, and to customize if needed their own methods for defining a de-balling/re-balling process that meets the requirements in this document.
Each customer determines the applicability of this document and the need for full replacement of the existing solder balls. Some applications can have unique requirements that exceed the scope of this document and are therefore specified separately.
This document is not intended to address all procedures and processes associated with a de-balling/re-balling facility; it is assumed there are management, quality, manufacturing, safety, calibration and training processes/procedures in place as well as all the necessary tools and equipment to accomplish the work.
NOTE 2 For the purposes of this document, if the term “BGA” is used alone, it is stated as “BGA component”.
NOTE 3 The replacement, for example, of damaged tin-lead balls by new tin-lead balls or damaged Pb-free balls by new Pb-free balls is not specifically addressed in this document but some parts of the document and the table for tailoring the requirements (see Annex A) can be used for supporting the operations.
Although developed for the avionics industry, this process can be applied by other industrial sectors at their discretion.
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | undefined |
4 | CONTENTS |
6 | FOREWORD |
8 | INTRODUCTION |
9 | 1 Scope |
10 | 2 Normative references |
11 | 3 Terms and definitions |
14 | 4 Process approach 4.1 Typical process |
15 | Figure 1 – Typical flowchart of de-balling/re-balling operations |
16 | 4.2 Awareness 5 General requirements 5.1 Process control at the customer level 5.1.1 Customer’s responsibilities 5.1.2 Electronic components classes Tables Table 1 – Electronic component class |
17 | 5.2 Process control at re-balling provider level 5.2.1 Re-balling provider’s responsibilities 5.2.2 Electronic component classes 5.2.3 Counterfeit prevention and traceability management |
18 | 5.2.4 Quality 5.2.5 Records 5.2.6 Facility requirements 5.2.7 Electrostatic discharge (ESD) 5.2.8 Physical handling of BGA components 5.2.9 Moisture/reflow sensitivity |
19 | 5.2.10 Configuration management 5.2.11 Personnel proficiency 5.2.12 Order of precedence 5.3 Customer and re-balling provider relationship 6 Technical requirements 6.1 Receipt of BGA components and separate balls 6.1.1 General 6.1.2 Incoming inspection of BGA components |
21 | 6.1.3 Incoming inspection of separate solder balls 6.2 Specific analysis based on component balls alloy Table 2 – Typical control and inspection test methods |
22 | 6.3 BGA component de-balling 6.3.1 General 6.3.2 Temperature excursions 6.3.3 Flux 6.3.4 Preheat 6.3.5 Solder balls removal (de-balling) |
23 | 6.3.6 Cool down 6.3.7 Cleaning (post de-balling) 6.3.8 Complete removal and cleanliness verification 6.4 BGA component re-balling 6.4.1 General 6.4.2 Capability |
24 | 6.4.3 Solder paste 6.4.4 Flux 6.4.5 Ball placement (alignment and co-planarity) 6.4.6 Preheating 6.4.7 Reflow temperature profile 6.4.8 Cooling down |
25 | 6.4.9 Cleaning (post re-balling) 6.5 Post-process inspection of re-balled BGA components 6.5.1 General 6.5.2 Production lot tests 6.5.3 Process monitoring and control Table 3 – Typical production lot test methods |
26 | 6.5.4 Case of failures 6.5.5 Records 6.6 Rework 6.6.1 General 6.6.2 Rework if authorized by the customer 6.7 New BGA component part number qualification 6.7.1 General Table 4 – Typical test methods for process monitoring and control |
27 | 6.7.2 New BGA component part number qualification by similarity 6.7.3 New BGA component part number qualification Table 5 – Typical test methods used for inspection of re-balled BGA components within the framework of new BGA component part number qualification |
28 | 6.7.4 Records 6.7.5 Customer’s approval 6.7.6 Cases of BGA component re-qualification Table 6 – Typical optional additional tests for new BGA component part number qualification |
29 | 6.8 Physical marking 6.9 Packaging and shipping 6.10 Re-balled BGA components segregation |
30 | Annex A (informative)Template for tailoring the requirements of IEC TS 62647-4 Table A.1 – Template for tailoring of requirements |
31 | Annex B (informative)Requirement matrix for IEC TS 62647-4 Table B.1 – Requirement matrix |
39 | Annex C (normative)Test methods Table C.1 – Test methods |
41 | Annex D (informative)Template for test methods tailoring in the frame of a BGA component production lot test plan or a new BGA component part number qualification test plan Table D.1 – Template for requirements tailoring |
42 | Bibliography |