BSI PD ISO/TR 9968:2023
$167.15
Road vehicles. Functional safety. The application to generic rechargeable energy storage systems for new energy vehicle
Published By | Publication Date | Number of Pages |
BSI | 2023 | 34 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | National foreword |
6 | Foreword |
7 | Introduction |
9 | 1 Scope 2 Normative references 3 Terms and definitions |
11 | 4 Abbreviated terms |
12 | 5 Item definition 5.1 Objectives 5.2 General |
13 | 5.3 OT is part of the item 5.3.1 General |
14 | 5.3.2 Assumptions 5.3.3 Functionality 5.3.4 Internal elements and their functionality |
15 | 5.3.5 Internal interfaces |
16 | 5.3.6 Other objects 5.3.7 External interfaces |
17 | 5.4 OT is not part of the item |
18 | 5.5 Safe intended functionality of the item 6 HARA and safety concepts 6.1 Objectives 6.2 General |
19 | 6.3 Case 1: Malfunctioning behaviour of the E/E systems can cause hazards related to the OT |
20 | 6.4 Case 2: Failure of OT causes E/E failures |
21 | 6.5 Case 3: Non-E/E-functional hazards and related hazardous conditions are addressed by E/E protection functions |
22 | 6.6 Case 4: Safety measures of elements of other technologies addressing functional safety requirements and safety goals |
23 | 6.7 Case 5: Combined OT and E/E safety measures implementing a safety requirement |
26 | 7 Verification and validation for RESS 7.1 OT related hazard and hazardous conditions |
27 | 7.2 Case 1: Malfunctioning behaviour of the E/E systems can cause hazards related to the OT 7.3 Case 2: Failure of OT causes E/E failures 7.4 Case 3: Non-E/E-functional hazards and related hazardous conditions are addressed by E/E protection functions 7.5 Case 4: Safety measures of OT addressing functional safety requirements and safety goals. 7.6 Case 5: Combined OT and E/E safety measures implementing a safety requirement |
28 | 8 Production, operation, service and decommissioning (POSD) 8.1 Objectives 8.2 General 8.3 Planning for production, operation, service and decommissioning 8.4 Production 8.5 Operation |
29 | 8.6 Service 8.7 Decommissioning |
30 | Annex A (informative) HARA and FSC example |