IEEE 1378-2022(Redline)
$51.46
IEEE Guide for Commissioning Line-Commutated Converter (LCC) High-Voltage Direct-Current (HVDC) Converter Stations and Associated Transmission Systems (Redline)
Published By | Publication Date | Number of Pages |
IEEE | 2022 |
Revision Standard – Active. General guidelines for commissioning high-voltage direct-current (HVDC) converter stations and associated transmission systems are provided. These guidelines apply to HVDC systems utilizing 6-pulse or 12-pulse thyristor-valve converter units operated as a two-terminal HVDC transmission system or an HVDC back-to-back system.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | IEEE Std 1378™-2022 Front cover |
2 | Title page |
4 | Important Notices and Disclaimers Concerning IEEE Standards Documents |
8 | Participants |
9 | Introduction |
10 | Contents |
11 | 1. Overview 1.1 Scope 1.2 Purpose 1.3 Word usage |
12 | 1.4 Limitations |
13 | 2. Normative references 3. Definitions, acronyms, and abbreviations 3.1 Definitions 3.2 Acronyms and abbreviations |
14 | 4. General 4.1 Overview |
16 | 4.2 Commissioning planning 4.3 General test conditions 5. Commissioning plan 5.1 Field test program |
17 | 5.2 Disturbance test schedule 5.3 Commissioning test flow diagram 5.4 Detailed test procedures |
19 | 5.5 Design documentation used |
20 | 5.6 Health, safety, and environment considerations 6. Commissioning plan implementation 6.1 Equipment (pre-commissioning) tests |
23 | 6.2 Subsystem tests |
28 | 6.3 Converter station tests |
29 | 6.4 HVDC transmission tests |
31 | 7. Trial operation |
32 | 7.1 Preconditions 7.2 Power scheduling operation 8. On-site acceptance |
33 | 8.1 Preconditions 8.2 Steady-state ratings |
35 | 8.3 Disturbance tests |
38 | 9. Final documentation 9.1 Performance documentation 9.2 As-built documentation |
39 | 9.3 Nonconformity reports |
40 | Annex A Bibliography |
41 | Annex B (informative) Off-site testing of HVDC control and protection system |
42 | B.1 Routine and type tests B.2 Steady-state performance tests |
43 | B.3 Dynamic performance tests |
44 | B.4 Functional performance tests |
45 | Back cover |