IEEE 421.4 1990
$72.04
IEEE Guide for the Preparation of Excitation System Specifications
Published By | Publication Date | Number of Pages |
IEEE | 1990 | 30 |
New IEEE Standard – Inactive – Superseded. Replaced by 421.1-2004 (SH/SS95244) Abstract: IEEE Std 421.4-1990, IEEE Guide for the Preparation of Excitation System specifications, is intended to be a narrative description of items and functions that should be considered in the preparation of excitation system specifications. This guide applies to excitation systems for synchronous machines rated at 5000 kVA or larger.
PDF Catalog
PDF Pages | PDF Title |
---|---|
1 | Title Page |
3 | Introduction Participants |
5 | CONTENTS |
7 | 1. Introduction 1.1 Purpose and Scope 1.2 References |
8 | 1.3 Definitions |
9 | 2. General 2.1 Basic 2.2 Operating Modes 2.3 Installation |
10 | 2.4 Conventions 2.5 Insulation Systems 2.6 Diodes and Thyristors 2.7 Availability 2.8 Redundancy of Equipment 2.9 Spare Parts 3. Exciter Rating Considerations 3.1 General |
11 | 3.2 Ratings 3.3 Transient Requirements |
12 | 4. Exciter Power Source Considerations 4.1 General |
13 | 4.2 Rotating DC Generator-Commutator Exciters 4.3 Rotating AC Exciters 4.4 Static Exciters |
14 | 5. Excitation System Performance and Synchronous Machine Regulator Considerations 5.1 Manual Control Performance 5.2 Automatic Control Performance (Including the Synchronous Machine) |
17 | 5.3 Auxiliary Control Functions |
18 | 6. Control Considerations 6.1 De-excitation 6.2 Unit Manual Control 6.3 Unit Automatic Control |
19 | 6.4 Unit Automatic Start/Stop 6.5 Unit Automatic Voltage Matching 6.6 Set-Point Adjusters 6.7 Set-Point Tracking 6.8 Control Circuit Interface to Power Plant Circuits |
20 | 7. Protection Considerations 7.1 General Requirements 7.2 Protective Action 7.3 Annunciation Action |
21 | 8. Environmental and Enclosure Considerations 8.1 Environmental 8.2 Enclosure |
22 | 8.3 Instruments and Controls for Remote Mounting 9. Information to Be Provided by the Manufacturer 9.1 General Requirements 9.2 Information That May Be Provided at the Time of Submission of Proposals 9.3 Information Provided Prior to Delivery of the Equipment |
23 | 9.4 Information to Be Provided with Equipment When it is Delivered 9.5 Photographs 9.6 Drawing Review Procedure During Project State 9.7 Drawing Review After Erection Is Completed 10. Tests 10.1 Routine Factory Tests |
26 | 10.2 Special Factory Tests |
28 | 10.3 Field Tests |
29 | 10.4 Routine Tests of Other Components |
30 | Annex A—AC-DC Power Converters |