{"id":334541,"date":"2024-10-19T23:19:39","date_gmt":"2024-10-19T23:19:39","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/fema-p-2055-post-disasterbuildingsafetyevaluationguidance-reporton-2020\/"},"modified":"2024-10-25T22:18:01","modified_gmt":"2024-10-25T22:18:01","slug":"fema-p-2055-post-disasterbuildingsafetyevaluationguidance-reporton-2020","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/fema\/fema-p-2055-post-disasterbuildingsafetyevaluationguidance-reporton-2020\/","title":{"rendered":"FEMA P 2055 Post disasterBuildingSafetyEvaluationGuidance Reporton 2020"},"content":{"rendered":"
None<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | FEMA P-2055 <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Post-disaster Building Safety Evaluation Guidance \u2013 Report on the Current State of Practice, including Recommendations Related to Structural and Nonstructural Safety and Habitability <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | Foreword <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Preface <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | Executive Summary <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | Table of Contents <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | List of Figures <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | List of Tables <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | Chapter 1: Introduction 1.1 Legislative Mandate <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 1.2 Purpose and Scope of Guide <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 1.3 Target Audience 1.4 What is Covered <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 1.5 Organization of Guide <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | Chapter 2: Context of Post-disaster Building Safety Evaluations 2.1 Overview <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 2.2 Well-established Post-disaster Building Safety Evaluation Guidance <\/td>\n<\/tr>\n | ||||||
31<\/td>\n | 2.3 FEMA Grant Assistance for Post-disaster Building Safety Evaluations <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | Safety Inspections <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 2.4 Other Types of Building Assessments 2.4.1 Preliminary Damage Assessment <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 2.4.2 FEMA Home Inspections <\/td>\n<\/tr>\n | ||||||
35<\/td>\n | Resources 2.4.3 FEMA Public Assistance Site Visits and Inspections Resources 2.4.4 Substantial Damage Determinations <\/td>\n<\/tr>\n | ||||||
37<\/td>\n | Resources 2.4.5 FEMA Building Performance and Mitigation Assessment Teams Resources <\/td>\n<\/tr>\n | ||||||
38<\/td>\n | 2.4.6 Utility Inspections <\/td>\n<\/tr>\n | ||||||
39<\/td>\n | 2.4.7 Insurance Claim Assessment <\/td>\n<\/tr>\n | ||||||
40<\/td>\n | 2.4.8 Research Organization Assessments <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 2.5 Building Code Administration and Enforcement Requirements for Building Safety Evaluations <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | 2.6 Resources for Building Safety Evaluations under the National Incident Management System <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | Chapter 3: Structural and Nonstructural Safety Evaluation 3.1 Overview <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | 3.2 Earthquakes <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | Best Practice Additional Discussion and Needs <\/td>\n<\/tr>\n | ||||||
51<\/td>\n | 3.3 Windstorms and Floods Best Practice Additional Discussion and Needs <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | 3.4 Land Instability Best Practice Additional Discussion and Needs <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | 3.5 Volcanic Eruptions <\/td>\n<\/tr>\n | ||||||
55<\/td>\n | Interim Recommendation Additional Discussion and Needs Resources <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | 3.6 Hail Storms <\/td>\n<\/tr>\n | ||||||
57<\/td>\n | Interim Recommendation <\/td>\n<\/tr>\n | ||||||
58<\/td>\n | Additional Discussion and Needs 3.7 Snow and Ice Storms <\/td>\n<\/tr>\n | ||||||
60<\/td>\n | Interim Recommendation Additional Discussion and Needs <\/td>\n<\/tr>\n | ||||||
61<\/td>\n | Resources 3.8 Fire <\/td>\n<\/tr>\n | ||||||
62<\/td>\n | Interim Recommendation Additional Discussion and Needs <\/td>\n<\/tr>\n | ||||||
63<\/td>\n | Resources 3.9 Explosion <\/td>\n<\/tr>\n | ||||||
64<\/td>\n | Interim Recommendation <\/td>\n<\/tr>\n | ||||||
65<\/td>\n | Additional Discussion and Needs 3.10 Multi-hazard Incidents <\/td>\n<\/tr>\n | ||||||
67<\/td>\n | Interim Recommendation Additional Discussion and Needs <\/td>\n<\/tr>\n | ||||||
69<\/td>\n | Resources 3.11 Evaluation of Historic and Cultural Resources <\/td>\n<\/tr>\n | ||||||
71<\/td>\n | Best Practice <\/td>\n<\/tr>\n | ||||||
72<\/td>\n | Additional Discussion and Needs Resources <\/td>\n<\/tr>\n | ||||||
75<\/td>\n | Chapter 4: Habitability Evaluation and Other Considerations 4.1 Overview <\/td>\n<\/tr>\n | ||||||
77<\/td>\n | 4.2 FEMA Policies on Habitability <\/td>\n<\/tr>\n | ||||||
78<\/td>\n | 4.3 Habitability Evaluation Approaches and Evaluator Skills 4.3.1 Habitability Evaluation Approaches <\/td>\n<\/tr>\n | ||||||
79<\/td>\n | 4.3.2 Evaluator Skills Needed <\/td>\n<\/tr>\n | ||||||
80<\/td>\n | 4.4 Environmental Hazard Evaluation <\/td>\n<\/tr>\n | ||||||
81<\/td>\n | Best Practice Interim Recommendation <\/td>\n<\/tr>\n | ||||||
84<\/td>\n | Additional Discussion and Needs <\/td>\n<\/tr>\n | ||||||
85<\/td>\n | 4.4.1 Natural Gas <\/td>\n<\/tr>\n | ||||||
86<\/td>\n | Best Practice Evaluation Strategy for Building Safety Evaluator 4.4.2 Carbon Monoxide Best Practice Evaluation Strategy for Building Safety Evaluator <\/td>\n<\/tr>\n | ||||||
87<\/td>\n | 4.4.3 Chemical Release Best Practice Evaluation Strategy for Building Safety Evaluator <\/td>\n<\/tr>\n | ||||||
88<\/td>\n | 4.4.4 Soot and Fumes Best Practice Evaluation Strategy for Building Safety Evaluator <\/td>\n<\/tr>\n | ||||||
89<\/td>\n | 4.4.5 Blackwater, Sewage, and Mold <\/td>\n<\/tr>\n | ||||||
90<\/td>\n | Best Practice Evaluation Strategy for Building Safety Evaluator <\/td>\n<\/tr>\n | ||||||
91<\/td>\n | 4.4.6 Asbestos <\/td>\n<\/tr>\n | ||||||
92<\/td>\n | Best Practice Evaluation Strategy for Building Safety Evaluator 4.4.7 Lead-Based Paint <\/td>\n<\/tr>\n | ||||||
93<\/td>\n | Best Practice Evaluation Strategy for Building Safety Evaluator 4.4.8 Parasites Best Practice Evaluation Strategy for Building Safety Evaluator <\/td>\n<\/tr>\n | ||||||
94<\/td>\n | 4.4.9 Wild, Stray, and Dead Animals Best Practice Evaluation Strategy for Building Safety Evaluator 4.4.10 Biting and Stinging Insects Best Practice Evaluation Strategy for Building Safety Evaluator <\/td>\n<\/tr>\n | ||||||
95<\/td>\n | 4.4.11 Debris and Refuse Best Practice Evaluation Strategy for Building Safety Evaluator 4.5 Building Systems and Services: Permanent Standards and Potential Temporary Standards <\/td>\n<\/tr>\n | ||||||
97<\/td>\n | 4.5.1 Mechanical, Electrical, and Plumbing Services 4.5.1.1 Pre-disaster Building Code Requirements <\/td>\n<\/tr>\n | ||||||
100<\/td>\n | 4.5.1.2 Potential Temporary Standards after a Disaster <\/td>\n<\/tr>\n | ||||||
101<\/td>\n | Interim Recommendation <\/td>\n<\/tr>\n | ||||||
103<\/td>\n | 4.5.2 Fire Alarm, Carbon Monoxide Alarm, and Fire Protection Services 4.5.2.1 Pre-disaster Building Code Requirements <\/td>\n<\/tr>\n | ||||||
104<\/td>\n | 4.5.2.2 Potential Temporary Standards after a Disaster Interim Recommendation <\/td>\n<\/tr>\n | ||||||
105<\/td>\n | 4.6 Other Code Issues: Permanent and Potential Temporary Standards <\/td>\n<\/tr>\n | ||||||
106<\/td>\n | 4.6.1 Habitable Space 4.6.1.1 Pre-disaster Building Code Requirements <\/td>\n<\/tr>\n | ||||||
107<\/td>\n | 4.6.1.2 Potential Temporary Standards after a Disaster 4.6.2 Means of Egress\/Emergency Escape <\/td>\n<\/tr>\n | ||||||
108<\/td>\n | 4.6.2.1 Pre-Disaster Building Code Requirements <\/td>\n<\/tr>\n | ||||||
109<\/td>\n | 4.6.2.2 Potential Temporary Standards After a Disaster 4.6.3 Accessibility for Persons with Disabilities, Access and Functional Needs, and Seniors 4.6.3.1 The Americans with Disabilities Act (ADA) <\/td>\n<\/tr>\n | ||||||
110<\/td>\n | 4.6.3.2 The Fair Housing Act <\/td>\n<\/tr>\n | ||||||
111<\/td>\n | 4.6.3.3 Pre-disaster Requirements 4.6.3.4 Issues to Consider <\/td>\n<\/tr>\n | ||||||
112<\/td>\n | 4.6.3.5 Temporary Standards After a Disaster <\/td>\n<\/tr>\n | ||||||
113<\/td>\n | 4.6.4 Security 4.6.4.1 Pre-disaster Building Code Requirements <\/td>\n<\/tr>\n | ||||||
114<\/td>\n | 4.6.4.2 Issues to Consider 4.6.4.3 Potential Temporary Standards after a Disaster <\/td>\n<\/tr>\n | ||||||
115<\/td>\n | 4.7 Application to Non-Residential Occupancy Types 4.8 Framework for Developing Temporary Habitability Policies <\/td>\n<\/tr>\n | ||||||
116<\/td>\n | 4.8.1 Interim Post-disaster Use of Residential Buildings <\/td>\n<\/tr>\n | ||||||
118<\/td>\n | 4.8.2 Example Temporary Habitability Standard after a Disaster <\/td>\n<\/tr>\n | ||||||
121<\/td>\n | 4.8.3 Issues to Consider in Developing Temporary Habitability Standards <\/td>\n<\/tr>\n | ||||||
122<\/td>\n | 4.8.3.1 Technical Questions <\/td>\n<\/tr>\n | ||||||
123<\/td>\n | 4.8.3.2 Administrative and Policy Questions <\/td>\n<\/tr>\n | ||||||
125<\/td>\n | 4.8.4 Approach Options for Implementing Temporary Habitability Policies <\/td>\n<\/tr>\n | ||||||
127<\/td>\n | Chapter 5: Pre-disaster Program Management 5.1 Overview <\/td>\n<\/tr>\n | ||||||
129<\/td>\n | 5.2 Pre-planning <\/td>\n<\/tr>\n | ||||||
130<\/td>\n | Interim Recommendation <\/td>\n<\/tr>\n | ||||||
131<\/td>\n | 5.3 Resource Typing Best Practice <\/td>\n<\/tr>\n | ||||||
132<\/td>\n | Post-disaster Building Safety Evaluator <\/td>\n<\/tr>\n | ||||||
133<\/td>\n | Post-disaster Building Safety Evaluation Strike Team Leader Post-disaster Building Safety Evaluation Strike Team Technical Supervisor <\/td>\n<\/tr>\n | ||||||
134<\/td>\n | Post-disaster Complex Structural Condition Evaluator Post-disaster Complex Architectural System Condition Evaluator <\/td>\n<\/tr>\n | ||||||
135<\/td>\n | Post-disaster Building Safety Evaluation Team Post-disaster Building Safety Evaluation Strike Team <\/td>\n<\/tr>\n | ||||||
136<\/td>\n | Organization Chart Additional Resource Types <\/td>\n<\/tr>\n | ||||||
137<\/td>\n | 5.4 Certification and Training 5.4.1 Post-disaster Building Safety Evaluators <\/td>\n<\/tr>\n | ||||||
141<\/td>\n | Best Practice Additional Discussion and Needs <\/td>\n<\/tr>\n | ||||||
142<\/td>\n | 5.4.2 Emergency Management Personnel Interim Recommendations Additional Discussion and Needs <\/td>\n<\/tr>\n | ||||||
143<\/td>\n | 5.5 Mutual Aid Resources and Agreements 5.5.1 Emergency Management Assistance Compact <\/td>\n<\/tr>\n | ||||||
144<\/td>\n | 5.5.2 Other Mutual Aid Systems Best Practice Additional Discussion and Needs <\/td>\n<\/tr>\n | ||||||
145<\/td>\n | 5.6 Volunteers, Liability, Good Samaritan Laws, and Workers\u2019 Compensation 5.6.1 Good Samaritan Laws <\/td>\n<\/tr>\n | ||||||
148<\/td>\n | 5.6.2 Federal Volunteer Protection Act 5.6.3 Workers\u2019 Compensation 5.6.4 Portability of Licensure <\/td>\n<\/tr>\n | ||||||
149<\/td>\n | Best Practice Interim Recommendation Additional Discussion and Needs <\/td>\n<\/tr>\n | ||||||
150<\/td>\n | Resources 5.7 Necessary Laws and Policies <\/td>\n<\/tr>\n | ||||||
151<\/td>\n | Interim Recommendation <\/td>\n<\/tr>\n | ||||||
152<\/td>\n | Resources <\/td>\n<\/tr>\n | ||||||
153<\/td>\n | Chapter 6: Post-disaster Program Management and Implementation 6.1 Overview <\/td>\n<\/tr>\n | ||||||
155<\/td>\n | 6.2 Implementing the Post-disaster Safety Evaluation Section of the Emergency Management Plan <\/td>\n<\/tr>\n | ||||||
156<\/td>\n | Best Practice 6.3 Deployment Safety and Tools <\/td>\n<\/tr>\n | ||||||
157<\/td>\n | 6.3.1 Recommended Equipment for Personal Safety of Evaluators <\/td>\n<\/tr>\n | ||||||
158<\/td>\n | 6.3.2 Safety from Environmental Hazards <\/td>\n<\/tr>\n | ||||||
160<\/td>\n | Best Practice 6.3.3 Field Tools and Resources for Evaluators <\/td>\n<\/tr>\n | ||||||
161<\/td>\n | Best Practice 6.4 Evaluation Prioritization <\/td>\n<\/tr>\n | ||||||
162<\/td>\n | Interim Recommendation Additional Discussion and Needs 6.5 Deployment Resources <\/td>\n<\/tr>\n | ||||||
163<\/td>\n | 6.5.1 National Level <\/td>\n<\/tr>\n | ||||||
164<\/td>\n | Best Practice 6.5.2 State Level <\/td>\n<\/tr>\n | ||||||
167<\/td>\n | Best Practice Interim Recommendation <\/td>\n<\/tr>\n | ||||||
168<\/td>\n | 6.6 Data Collection and Reporting <\/td>\n<\/tr>\n | ||||||
171<\/td>\n | Best Practice Interim Recommendation <\/td>\n<\/tr>\n | ||||||
172<\/td>\n | 6.7 Quality Assurance <\/td>\n<\/tr>\n | ||||||
175<\/td>\n | Interim Recommendation Additional Discussion and Needs <\/td>\n<\/tr>\n | ||||||
176<\/td>\n | 6.8 Reevaluation Triggers <\/td>\n<\/tr>\n | ||||||
177<\/td>\n | Interim Recommendation Additional Discussion and Needs 6.9 Changing or Removing a Placard <\/td>\n<\/tr>\n | ||||||
178<\/td>\n | Interim Recommendation Additional Discussion and Needs <\/td>\n<\/tr>\n | ||||||
179<\/td>\n | 6.10 Cordoning and Barricading <\/td>\n<\/tr>\n | ||||||
180<\/td>\n | Best Practice Additional Discussion and Needs <\/td>\n<\/tr>\n | ||||||
181<\/td>\n | 6.11 Communication with the Public, the Media, and Building Owners and Occupants <\/td>\n<\/tr>\n | ||||||
182<\/td>\n | Interim Recommendation <\/td>\n<\/tr>\n | ||||||
183<\/td>\n | Chapter 7: Emerging Technologies and Development Needs 7.1 Overview 7.2 Building Owner\u2019s Guide to Safety Assessment <\/td>\n<\/tr>\n | ||||||
184<\/td>\n | Recommendations 7.3 Emerging Technologies <\/td>\n<\/tr>\n | ||||||
185<\/td>\n | 7.3.1 Social Media 7.3.2 Machine Learning and Artificial Intelligence 7.3.3 Strong-motion Data <\/td>\n<\/tr>\n | ||||||
186<\/td>\n | 7.3.4 Geospatial Data <\/td>\n<\/tr>\n | ||||||
188<\/td>\n | 7.3.5 Aerial Vehicles 7.3.6 Other Technologies and Applications <\/td>\n<\/tr>\n | ||||||
189<\/td>\n | Recommendations <\/td>\n<\/tr>\n | ||||||
191<\/td>\n | Chapter 8: Conclusions and Recommendations 8.1 Guide Overview <\/td>\n<\/tr>\n | ||||||
192<\/td>\n | 8.2 Key Conclusions <\/td>\n<\/tr>\n | ||||||
193<\/td>\n | 8.3 Best Practices for Post-disaster Building Safety Evaluators <\/td>\n<\/tr>\n | ||||||
198<\/td>\n | 8.4 Best Practices for Emergency Managers and Building Officials <\/td>\n<\/tr>\n | ||||||
199<\/td>\n | 8.5 Best Practices for Policy Makers <\/td>\n<\/tr>\n | ||||||
201<\/td>\n | Appendix A: Glossary and Acronyms A.1 Glossary <\/td>\n<\/tr>\n | ||||||
205<\/td>\n | A.2 Acronyms <\/td>\n<\/tr>\n | ||||||
211<\/td>\n | Appendix B: Referenced Codes and Standards <\/td>\n<\/tr>\n | ||||||
213<\/td>\n | References <\/td>\n<\/tr>\n | ||||||
223<\/td>\n | Project Participants <\/td>\n<\/tr>\n | ||||||
228<\/td>\n | Back Cover <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" FEMA P-2055, Post-disaster Building Safety Evaluation Guidance-Report on the Current State of Practice , including Recommendations Related to Structural and Nonstructural Safety and Habitability<\/b><\/p>\n |