{"id":373511,"date":"2024-10-20T02:34:27","date_gmt":"2024-10-20T02:34:27","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/awwa-c514-2020\/"},"modified":"2024-10-26T04:31:45","modified_gmt":"2024-10-26T04:31:45","slug":"awwa-c514-2020","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/awwa\/awwa-c514-2020\/","title":{"rendered":"AWWA C514 2020"},"content":{"rendered":"
The purpose of this standard is to provide the minimum requirements for inflow preventer assemblies including material, design, inspection, testing, marking, handling, and packaging for shipment. This standard can be referenced in documents for inflow preventer assemblies. The stipulations of this standard apply when this document has been referenced and then only to inflow preventer assemblies for potable water distribution systems or storage facility vent pipes.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
11<\/td>\n | SECTION 1: GENERAL Sec. 1.1 Scope Sec. 1.2 Purpose Sec. 1.3 Application <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | SECTION 2: REFERENCES <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | SECTION 3: DEFINITIONS <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | SECTION 4: REQUIREMENTS Sec. 4.1 Data to Be Provided by Manufacturer or Supplier Sec. 4.2 Materials <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | Sec. 4.3 General Design and Detailed Design Requirements <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | Sec. 4.4 Welding and Fabrication <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | Sec. 4.5 Workmanship and Painting SECTION 5: VERIFICATION Sec. 5.1 Testing <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | Sec. 5.2 Inspection <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | Sec. 5.3 Rejection SECTION 6: DELIVERY Sec. 6.1 Marking Sec. 6.2 Preparation for Shipment Sec. 6.3 Affidavit of Compliance <\/td>\n<\/tr>\n | ||||||
25<\/td>\n | APPENDIX A SECTION A.1: GENERAL SECTION A.2: UNLOADING SECTION A.3: STORAGE <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | SECTION A.4: INSPECTION PRIOR TO INSTALLATION SECTION A.5: INSTALLATION <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | SECTION A.6: FIELD TESTING SECTION A.7: OWNER\u2019S RECORDS SECTION A.8: OPERATION <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | SECTION A.9: MAINTENANCE <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" AWWA C514-20 Air Valve and Vent Inflow Preventer Assemblies for Potable Water Distribution System and Storage Facilities<\/b><\/p>\n |