Shopping Cart

No products in the cart.

ASME B30.7 11:2011 Edition

$98.04

ASME B30.7 Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings

Published By Publication Date Number of Pages
ASME 2011 36
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

PDF Catalog

PDF Pages PDF Title
5 CONTENTS
6 FOREWORD
8 COMMITTEE ROSTER
10 B30 STANDARD INTRODUCTION
SECTION I: SCOPE
SECTION II: SCOPE EXCLUSIONS
SECTION III: PURPOSE
SECTION IV: USE BY REGULATORY AGENCIES
11 SECTION V: EFFECTIVE DATE
SECTION VI: REQUIREMENTS AND RECOMMENDATIONS
SECTION VII: USE OF MEASUREMENT UNITS
SECTION VIII: REQUESTS FOR REVISION
SECTION IX: REQUESTS FOR INTERPRETATION
SECTION X: ADDITIONAL GUIDANCE
13 SUMMARY OF CHANGES
15 Chapter 7-0 Scope, Definitions, and References
SECTION 7-0.1: SCOPE OF B30.7
SECTION 7-0.2: DEFINITIONS
16 SECTION 7-0.3: REFERENCES TO OTHER CODES AND STANDARDS
17 FIGURES

7-0.2-1 Single-Drum Winch
7-0.2-2 Three-Drum Winch With Attached Swinger
7-0.2-3 Winch With Capstan
18 7-0.2-4 Independent Direct Geared Swinger or Single-Drum Winch
19 Chapter 7-1 Construction and Installation
SECTION 7-1.1: RATINGS AND MARKINGS
7-1.1.1 Basis
7-1.1.2 Winch Ratings
7-1.1.3 Markings
7-1.1.4 Rope Layer Ratings
SECTION 7-1.2: CONSTRUCTION
7-1.2.1 General
7-1.2.2 Winch Mechanisms
7-1.2.3 Brakes
7-1.2.4 Guards
7-1.2.5 Ropes
20 7-1.2.6 Winch Controls
7-1.2.7 Control Forces and Movements
7-1.2.8 Engine Clutch
7-1.2.9 Jaw Clutch
7-1.2.10 Electric Resistors
7-1.2.11 Switches
7-1.2.12 Lubrication
SECTION 7-1.3: INSTALLATION
7-1.3.1 Attachments and Anchorages
7-1.3.2 Installation Location of Winches
21 Chapter 7-2 Inspection, Testing, and Maintenance
SECTION 7-2.1: INSPECTION
7-2.1.1 General
7-2.1.2 Initial Inspection and Test
7-2.1.3 Daily Inspection and Test
7-2.1.4 Frequent Inspection
22 7-2.1.5 Periodic Inspection
7-2.1.6 Winches Not in Regular Service
SECTION 7-2.2: TESTING
7-2.2.1 Operational Tests
7-2.2.2 Load Test
23 SECTION 7-2.3: MAINTENANCE
7-2.3.1 Preventive Maintenance
7-2.3.2 Maintenance Procedure
7-2.3.3 Adjustments and Repairs
7-2.3.4 Lubrication
SECTION 7-2.4: ROPE INSPECTION, REPLACEMENT, AND MAINTENANCE
7-2.4.1 Rope Inspection
7-2.4.2 Rope Replacement
24 7-2.4.3 Rope Maintenance
25 Chapter 7-3 Operations
SECTION 7-3.1: QUALIFICATIONS AND CONDUCT OF OPERATORS
7-3.1.1 Operators
7-3.1.2 Qualifications for Operators
7-3.1.3 Conduct of Operators
26 7-3.1.4 Cautions to Personnel
SECTION 7-3.2: OPERATING PRACTICES
7-3.2.1 Winch Selection
7-3.2.2 Size of Load
7-3.2.3 Moving the Load
27 7-3.2.4 Holding the Load
7-3.2.5 Use of a Capstan Drum
7-3.2.6 Storage
SECTION 7-3.3: MISCELLANEOUS
7-3.3.1 Fire Extinguisher
7-3.3.2 Refueling
SECTION 7-3.4: COMMUNICATIONS
7-3.4.1 General
7-3.4.2 Standard Signals
7-3.4.3 Signalperson Qualifications
28 7-3.4.4 Standard Hand Signals
7-3.4.5 Standard Voice Signals
7-3.4.6 Special Signals
29 7-3.4.4-1 Standard Hand Signals for Controlling Winch Operations
31 ASME B30.7 INTERPRETATIONS
32 Interpretation: 7-1
ASME B30.7 11
$98.04