Shopping Cart

No products in the cart.

BS 8415:2018 – TC:2020 Edition

$217.84

Tracked Changes. Memorials within burial grounds and memorial sites. Specification

Published By Publication Date Number of Pages
BSI 2020 87
Guaranteed Safe Checkout
Categories: ,

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

PDF Catalog

PDF Pages PDF Title
54 Foreword
56 1 Scope
2 Normative references
57 3 Terms and definitions
Figure 1 — Canopy
60 Figure 2 — Typical components of a memorial
61 4 Materials
4.1 Cement
62 4.2 Natural stone
4.3 Concrete
4.4 Materials for dowels, cramps, fixings and ground support mechanisms
Table 1 — Materials for dowels and cramps
4.5 Reinforcing steel for foundations
4.6 Jointing, pointing and bedding
63 Table 2 — Jointing, pointing and bedding materials
5 Design and construction
5.1 General
5.2 Memorials less than 625 mm above ground level
5.3 Memorials greater than 625 mm above ground level
64 5.4 Mass of memorial
5.5 Foundations
65 Table 3 — Minimum footing requirements
66 Figure 3 — Typical foundation details for a lawn memorial and slabs
67 5.6 Construction of memorials using dowels for joining vertical components
5.7 Joints
5.8 Lettering and ornamentation
6 Pre-installation
7 Plot identification
68 Table 4 — Size of dowels and dowel holes for hard limestone, marble, slate and granite
69 Table 5 — Size of dowels and dowel holes for limestone and other soft stones
70 Table 6 — Threaded studs sizes
8 Checking the condition of existing memorials
71 Annex A (normative)  Existing memorials: Managing safety risk assessments
73 Table A.1 — Classification of the memorial on the basis of their assessment
75 Annex B (informative)  Glossary
76 Annex C (informative)  Recommendations on the installation of memorials
78 Annex D (informative)  Example design details for memorials
Figure D.1 — Pre-cast foundation and ground support system for lawn-type memorial
Figure D.2 — Monolith memorial erected in a shoe foundation
79 Figure D.3 — Pier foundation using blocks
Figure D.4 — Example concrete pier foundation using studs
80 Figure D.5 — Studding method of fixing inscription plate to base
Figure D.6 — Method of fixing on concrete beams or cast in-situ foundation
81 Figure D.7 — Typical inscription plate with kerb surround
82 Figure D.8 — Typical double space kerbs and inscription plate
83 Annex E (normative)  Anchorage system: Horizontal load test
85 Bibliography
BS 8415:2018 - TC
$217.84