BS ISO 24516-3:2017
$198.66
Guidelines for the management of assets of water supply and wastewater systems – Wastewater collection networks
Published By | Publication Date | Number of Pages |
BSI | 2017 | 54 |
This document specifies guidelines for technical aspects, tools and good practices for the management of assets of wastewater networks to maintain value from existing assets.
This document does not apply to the management of assets of treatment plants, which are also physically part of the wastewater system and can influence the management of network assets.
NOTE 1 The management of the following individual assets will be covered by ISO 24516‑4 : wastewater pumping stations, retention and detention in the network, wastewater treatment plants and sludge treatment facilities.
This document includes examples of good practice approaches on the strategic, tactical and operational levels.
This document is applicable to all types and sizes of organizations and/or utilities operating wastewater networks, and all different roles/functions for the management of assets within a utility (e.g. asset owner/responsible body, asset manager/operator, service provider/operator).
NOTE 2 Depending on the size and structure of an organization, the utility can decide to what extent it applies the guidance in this document, but in any case, the philosophy of this document remains applicable to small and medium utilities.
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | National foreword |
7 | Foreword |
8 | Introduction |
11 | 1 Scope 2 Normative references 3 Terms and definitions |
15 | 4 Principal aspects of the management of assets 4.1 Objectives and requirements 4.1.1 Objectives 4.1.2 Functional requirements |
16 | 4.1.3 Performance requirements |
18 | 4.2 General aspects 4.2.1 General 4.2.2 Principal aspects — Wastewater utilities |
19 | 4.2.3 Principal aspects — Wastewater systems 4.2.4 Integrating the principal aspects 4.3 Specific aspects 4.3.1 Risk |
21 | 4.3.2 Life cycle 4.4 Structuring the process for the management of assets 4.4.1 General |
22 | 4.4.2 Strategies for the management of assets |
23 | 4.4.3 Periods of planning |
24 | 4.4.4 Strategic level activities 4.4.5 Tactical level activities 4.4.6 Operational level activities |
25 | 5 Investigation 5.1 General 5.2 Purpose of investigation 5.3 Determine the scope of the investigation |
26 | 5.4 Types of investigation 5.4.1 Hydraulic investigation 5.4.2 Environmental investigation 5.4.3 Structural investigation |
27 | 5.4.4 Operational investigation 5.5 Data collection 5.5.1 General 5.5.2 Data requirements 5.5.3 Inventory data |
28 | 5.5.4 Failure data |
29 | 5.5.5 Further condition data |
30 | 5.6 Data registering and data assignment 5.6.1 Data registering |
31 | 5.6.2 Data assignment 5.6.3 Geo-referencing 5.7 Review existing information 5.8 Inventory update 5.9 Review of performance information |
32 | 5.10 Planning of investigation 5.11 Performance testing |
33 | 6 Assessment 6.1 Principles 6.2 Assessment of the hydraulic performance 6.3 Assessment of environmental impact |
34 | 6.4 Assessment of structural condition 6.5 Assessment of operational performance 6.6 Comparison with performance requirements 6.7 Identification of unacceptable impacts 6.8 Identification of causes of performance deficiencies 7 Planning 7.1 General |
35 | 7.2 Develop integrated solutions |
36 | 7.3 Assess solutions 7.4 Prepare an action plan |
39 | 8 Implementation 8.1 General 8.2 Create/update plan 8.3 Carry out work |
40 | 8.4 Monitor performance 8.5 Review performance 9 Operation and maintenance 9.1 General |
41 | 9.2 Operation 9.3 Maintenance |
42 | 10 Rehabilitation 10.1 General 10.2 Strategic plan on rehabilitation 10.2.1 General |
43 | 10.2.2 Strategic approaches |
44 | 10.2.3 Budgeting |
45 | 10.3 Tactical planning for rehabilitation of physical infrastructure (mid-term planning) 10.3.1 Risk-based evaluation approach 10.3.2 Individual evaluation and prioritizing |
46 | 10.3.3 Coordination with other construction activities 10.4 Operational plan — Implementation plan for rehabilitation measures 11 Documentation and performance review |
48 | Annex A (informative) Objectives and functional requirements |
51 | Bibliography |