Shopping Cart

No products in the cart.

BSI 23/30458350 DC 2023

$13.70

BS EN 50549-1 AMD 1. Requirements for generating plants to be connected in parallel with distribution networks – Part 1. Connection to a LV distribution network. Generating plants up to and including Type B

Published By Publication Date Number of Pages
BSI 2023 14
Guaranteed Safe Checkout
Category:

If you have any questions, feel free to reach out to our online customer service team by clicking on the bottom right corner. We’re here to assist you 24/7.
Email:[email protected]

PDF Catalog

PDF Pages PDF Title
6 1 Modification to Introduction
2 Modification to Clause 2, “Normative references”
3 Modification to Clause 3, “Terms and definitions”
8 4 Modification to Clause 4, “Requirements on generating plants”
4.1 Modification to subclause 4.1, “General”
4.2 Modification to subclause 4.5, “Immunity to disturbances”
4.2.1 Modification to subclause 4.5.1, “General”
4.2.2 Modification to subclause 4.5.2, “Rate of change of frequency (ROCOF) immunity”
9 4.2.3 Modification to subclause 4.5.3, “Under-voltage ride through (UVRT)”
4.2.3.1 Modification to subclause 4.5.3.1, “General”
4.2.4 Modification to subclause 4.5.4, “Over-voltage ride through (OVRT)”
10 4.2.5 Addition of subclause 4.5.5, “Phase jump immunity”
11 4.3 Modification to subclause 4.6, “Active response to frequency deviation”
4.3.1 Modification to subclause 4.6.1, “Power response to overfrequency”
4.4 Modification to subclause 4.7, “Power response to voltage changes”
4.4.1 Modification to subclause 4.7.2, “Voltage support by reactive power”
4.4.1.1 Modification to subclause 4.7.2.2, “Capabilities”
12 4.4.2 Modification to subclause 4.7.3, “Voltage related active power reduction”
4.5 Modification to subclause 4.9, “Interface protection”
4.5.1 Modification to subclause 4.9.3, “Requirements on voltage and frequency protection”
4.5.1.1 Modification to subclause 4.9.3.2, “Undervoltage protection [27]”
4.5.1.2 Modification to subclause 4.9.3.3, “Overvoltage protection [59]”
4.6 Modification to subclause 4.11, “Ceasing and reduction of active power on set point”
4.6.1 Modification to subclause 4.11.2, “Reduction of active power on set point”
5 Modification to Annex C, “Parameter Table”
13 6 Modification to Annex D, “List of national requirements applicable for generating plants”
7 Modification to Annex F, “Examples of protection strategies”
BSI 23/30458350 DC 2023
$13.70