BSI PD CEN/CLC/TR 17603-20-02:2021
$167.15
Space engineering. Li-ion battery testing handbook
Published By | Publication Date | Number of Pages |
BSI | 2021 | 34 |
PDF Catalog
PDF Pages | PDF Title |
---|---|
2 | undefined |
8 | 1 Scope |
9 | 2 References |
10 | 3 Terms, definitions and abbreviated terms 3.1 Terms from other documents 3.2 Terms specific to the present document |
16 | 3.3 Abbreviated terms |
17 | 4 Cell or battery testing 4.1 Introduction |
18 | 4.2 Test documentation 4.2.1 Test plan and test procedures 4.2.2 Test report |
19 | 4.3 Tests 4.3.1 Initial electrical characterisation tests 4.3.2 Standard capacity and energy measurements 4.3.3 Internal resistance measurement |
20 | 4.3.4 AC impedance measurement 4.3.5 Self-discharge test 4.3.6 Charge retention test 4.3.7 Cell rate capability 4.3.8 Cell EMF measurement |
21 | 4.3.9 Battery magnetic moment measurement 4.3.10 Battery corona testing 4.4 Environmental tests 4.4.1 Objectives 4.4.2 Mechanical tests: vibration (low level sine, random, sine) and shock |
22 | 4.4.3 Thermal vacuum test 4.4.4 Leak test |
23 | 4.4.5 Hermeticity test (Helium test) 4.4.6 Radiation test 4.5 Life tests 4.5.1 Objectives 4.5.2 Calendar tests (survivability test) 4.5.3 Cycling tests 4.5.3.1 General |
24 | 4.5.3.2 Constant DoD or DoDE 4.5.3.3 Mission profile, including micro-cycling (ripple) |
26 | 4.5.3.4 Real time tests 4.5.3.5 Accelerated tests 4.5.3.6 Wear-out tests |
27 | 4.6 Safety tests 4.6.1 Objectives 4.6.2 Overcharge 4.6.3 Overdischarge |
28 | 4.6.4 Short-circuit test 4.6.4.1 Objective 4.6.4.2 External short-circuit 4.6.4.3 Internal short-circuit 4.6.5 Vent and burst tests 4.6.5.1 Objectives 4.6.5.2 Vent test 4.6.5.3 Burst test 4.6.6 Protective devices |
29 | 4.7 Storage, handling, transport, AIT 4.7.1 General 4.7.2 Storage and maintenance conditions 4.7.3 Handling 4.7.4 Transport 4.7.5 Assembly Integration Test (AIT) |
30 | 5 Test applicability matrix |