WRC volume 48 No. 09-10:1993
$27.95
Progress Reports Volume 48 No. 09-10
Published By | Publication Date | Number of Pages |
WRC | 1993 | 158 |
Contents
This volume includes the full Minutes of the Executive Committee and the Design Division. The balance of the PVRC Minutes, including those of the PVRC Materials and Fabrication Division, appear in the companion volume, November/December 1993 Progress Reports.
– Executive Committee, May 26, 1992
– JPVRC Progress Reports
– Design Division, May 26, 1993
– Committee on Bolted Flanged Connections, May 25, 1993
– Flanges Parameter Study Task Group, May 24, 1993
– Task Group on Valve Stem Emissions, May 25, 1993
– Committee on Dynamic Analysis and Testing, May 25, 1993
– Subcommittee on Dynamic Stress Criteria, May 25, 1993
– Committee on Elevated Temperature Design, May 25, 1993
– Committee on Piping and Nozzles, May 24, 1993
– Subcommittee on Long Range Planning, May 24, 1993
– Subcommittee on Shell Intersections, May 24, 1993
– Task Group on Large Diameter Shell Intersections, May 24, 1993
– Committee on Polymers for Pressure Components, May 25, 1993
– Committee on Shells and Ligaments, May 24, 1993
– Fatigue Coordinating Committee, May 25-26, 1993
– Task Group on Continuing Operation of Equipment, January 25, 1993
– Task Group on Continuing Operation of Equipment, May 24, 1993
– Steering Committee on Cyclic Life and Environmental Effects in Nuclear Applications, May 25, 1993
– Working Group on da/dN Data Analysis, May 25, 1993
– Working Group on Evaluation Methods, May 24, 1993
– Task Group on Total Damage Evaluation, May 25, 1993
– Working Group on S-N Curve Data, May 24, 1993
– Working Group on S-N Curve Data, April 21, 1993