{"id":170733,"date":"2024-10-19T10:30:07","date_gmt":"2024-10-19T10:30:07","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/aci-347-2r-17\/"},"modified":"2024-10-25T02:39:38","modified_gmt":"2024-10-25T02:39:38","slug":"aci-347-2r-17","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/aci\/aci-347-2r-17\/","title":{"rendered":"ACI 347.2R 17"},"content":{"rendered":"
This guide presents information and design criteria for shoring\/reshoring operations during the construction of reinforced and post-tensioned multistory buildings. Methods for developing safe construction practices, including sequencing and timing, as well as design examples, are provided. It is written for the use of formwork engineer\/contractors and engineer\/architects. Keywords: construction loads; falsework; form removal; formwork; post-tensioning; reshoring; shoring.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
3<\/td>\n | TITLE PAGE \n <\/td>\n<\/tr>\n | ||||||
4<\/td>\n | CHAPTER 1\u2014INTRODUCTION 1.2\u2014Scope CHAPTER 2\u2014NOTATION AND DEFINITIONS 2.1\u2014Notation <\/td>\n<\/tr>\n | ||||||
5<\/td>\n | 2.2\u2014Definitions CHAPTER 3\u2014SHORING\/RESHORING CONSTRUCTION NEEDS 3.1\u2014Use of reshoring 3.2\u2014Types of forming systems <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | CHAPTER 4\u2014CONSTRUCTION LOADS ON FORMWORK 4.1\u2014Construction loads 4.2\u2014Load combinations <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | 4.3\u2014Typical construction phases <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 4.4\u2014Construction load distribution 4.5\u2014Application of the simplified method <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 4.6\u2014Factors affecting the construction load distribution <\/td>\n<\/tr>\n | ||||||
11<\/td>\n | 4.7\u2014Post-tensioning load redistribution <\/td>\n<\/tr>\n | ||||||
12<\/td>\n | CHAPTER 5\u2014STRENGTH OF CONCRETE SLABS AND FORMWORK 5.1\u2014Early-age concrete material strength development <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | 5.2\u2014Construction load factors 5.3\u2014Early-age strength of concrete slabs <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 5.4\u2014Serviceability of concrete slabs 5.5\u2014Strength of formwork CHAPTER 6\u2014CONSTRUCTION EXAMPLES 6.1\u2014Two-way slab construction <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 6.2\u2014Post-tensioned construction example <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | CHAPTER 7\u2014REFERENCES <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | Authored documents <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" 347.2R-17: Guide for Shoring\/Reshoring of Concrete Multistory Buildings<\/b><\/p>\n |