{"id":244423,"date":"2024-10-19T16:03:28","date_gmt":"2024-10-19T16:03:28","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-en-623372012\/"},"modified":"2024-10-25T11:02:35","modified_gmt":"2024-10-25T11:02:35","slug":"bs-en-623372012","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-en-623372012\/","title":{"rendered":"BS EN 62337:2012"},"content":{"rendered":"
This International Standard defines specific phases and milestones (see Figure 1) in the commissioning of electrical, instrumentation and control systems in the process industry. By way of example, it describes activities following the \u201cc ompletion-of-erection\u201d milestone o f the project and prior to the \u201ca cceptance-of-the-plant\u201d phase by the owner. Such activities need to be adapted for each t ype of process\/plant concerned.<\/p>\n
\nNOTE This standard assumes that the \u201cacceptance -of-the-plant\u201d milestone will occur after the performance test. If there is a reduced scope, this document should be adapted accordingly.<\/p>\n<\/blockquote>\n
NOTE Construction and precommissioning activities could be overlapping.<\/p>\n
For application in the pharmaceutical or other highly specialized industries, additional guidelines (for example, Good Automated Manufacturing Practice<\/i> (GAMP)), definitions and stipulations should apply in accordance with existing standards, for example, for GMP Compliance 21 CFR (FDA) and the Standard Operating Procedure of the European Medicines Agency (SOP\/INSP\/2003).<\/p>\n
PDF Catalog<\/h4>\n
\n
\n PDF Pages<\/th>\n PDF Title<\/th>\n<\/tr>\n \n 6<\/td>\n English
CONTENTS <\/td>\n<\/tr>\n\n 7<\/td>\n INTRODUCTION <\/td>\n<\/tr>\n \n 8<\/td>\n 1 Scope
2 Normative references
Figure\u00a01 \u2013 Definition of phases and milestones <\/td>\n<\/tr>\n\n 9<\/td>\n 3 Terms and definition <\/td>\n<\/tr>\n \n 12<\/td>\n 4 General preparations before acceptance of plant
5 Completion of erection
5.1 Mechanical checks and tests <\/td>\n<\/tr>\n\n 13<\/td>\n 5.2 Procedure
6 Precommissioning (mechanical completion)
6.1 General
6.2 Procedure <\/td>\n<\/tr>\n\n 14<\/td>\n 7 Commissioning
7.1 General
7.2 Procedure <\/td>\n<\/tr>\n\n 15<\/td>\n 7.3 Execution of performance test
Untitled <\/td>\n<\/tr>\n\n 16<\/td>\n 8 Performance test and acceptance of plant
8.1 General
8.2 Conditions for commencement of performance test <\/td>\n<\/tr>\n\n 17<\/td>\n 8.3 Execution of performance test
8.4 Evaluation and report of performance test <\/td>\n<\/tr>\n\n 19<\/td>\n Annex A (informative) List of documents to be used forthe precommissioning and commissioning phase <\/td>\n<\/tr>\n \n 21<\/td>\n Annex B (informative) Description of precommissioning activities
Tables
Table\u00a0B.1 \u2013 General procedures <\/td>\n<\/tr>\n\n 25<\/td>\n Table\u00a0B.2 \u2013 Specific procedures <\/td>\n<\/tr>\n \n 32<\/td>\n Annex C (informative) Mechanical completion certificate <\/td>\n<\/tr>\n \n 33<\/td>\n Annex D (informative) Description of commissioning activities
Table\u00a0D.1 \u2013 Activities to be performed during the commissioning stage <\/td>\n<\/tr>\n\n 35<\/td>\n Annex E (informative) Acceptance of plant certificate <\/td>\n<\/tr>\n \n 36<\/td>\n Annex F (informative) Project-specific items
Table\u00a0F.1 \u2013 Project-specific items to be discussed and agreed upon <\/td>\n<\/tr>\n\n 37<\/td>\n Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Commissioning of electrical, instrumentation and control systems in the process industry. Specific phases and milestones<\/b><\/p>\n
\n\n
\n Published By<\/td>\n Publication Date<\/td>\n Number of Pages<\/td>\n<\/tr>\n \n BSI<\/b><\/a><\/td>\n 2013<\/td>\n 40<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":244425,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[1231,2641],"product_tag":[],"class_list":{"0":"post-244423","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-91-040-20","7":"product_cat-bsi","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/244423","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/244425"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=244423"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=244423"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=244423"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}