{"id":245700,"date":"2024-10-19T16:09:44","date_gmt":"2024-10-19T16:09:44","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pd-iec-ts-62257-7-32018-tc\/"},"modified":"2024-10-25T11:10:29","modified_gmt":"2024-10-25T11:10:29","slug":"bsi-pd-iec-ts-62257-7-32018-tc","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pd-iec-ts-62257-7-32018-tc\/","title":{"rendered":"BSI PD IEC\/TS 62257-7-3:2018 – TC"},"content":{"rendered":"

IEC TS 62257-7-3:2018(E) specifies the general requirements for the selection, sizing, erection and operation of generator sets in decentralized rural electrification systems. It applies to all low voltage combustion engine electricity generator sets energized by renewable energy such as biomass gasifier or biogas, or fossil fuel such as gasoline or diesel fuel, and designed for supplying electrical power to isolated sites used in systems as described in IEC TS 62257-2. The aim of this document is to provide users with the appropriate guide to select generator sets for using in micropower plant with different configurations and levels of reliability and safety of the equipment during its estimated service lifespan. This document describes the minimum requirement of generator set functionality and safety requirements and does not claim to be an exhaustive instruction manual or design specification. The main technical changes of this new edition with regard to the previous edition are as follows: – Increased the voltage and power levels to which this TS applies. – Added descriptions of four different types of micropower systems and their relevant requirements.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\ncompares PD IEC\/TS 62257-7-3:2018 <\/td>\n<\/tr>\n
2<\/td>\nTRACKED CHANGES
Text example 1 \u2014 indicates added text (in green) <\/td>\n<\/tr>\n
50<\/td>\nundefined <\/td>\n<\/tr>\n
52<\/td>\nCONTENTS <\/td>\n<\/tr>\n
55<\/td>\nFOREWORD <\/td>\n<\/tr>\n
57<\/td>\nINTRODUCTION <\/td>\n<\/tr>\n
58<\/td>\n1 Scope <\/td>\n<\/tr>\n
59<\/td>\nFigures
Figure 1 \u2013 General functional configuration of micropower plantin micropower system <\/td>\n<\/tr>\n
60<\/td>\n2 Normative references <\/td>\n<\/tr>\n
61<\/td>\n3 Terms and definitions <\/td>\n<\/tr>\n
64<\/td>\n4 Introduction to generator sets
4.1 Generator set system
4.2 Generator set application in rural electrification systems
4.2.1 General
4.2.2 Single generator set (micropower plant Type A)
4.2.3 Multiple generator sets (micropower plant Type B)
Figure 2 \u2013 Micropower plant Type A: single generator set <\/td>\n<\/tr>\n
65<\/td>\n4.2.4 Single generator set with a power conditioning sub-system (micropower plant Type C)
4.2.5 Multiple generator sets with multiple power conditioning sub-systems (micropower plant Type D)
Figure 3 \u2013 Micropower plant Type B: multiple generator setsin micropower plant
Figure 4 \u2013 Micropower plant Type C: single generator set witha power conditioning sub-system in micropower plant <\/td>\n<\/tr>\n
66<\/td>\n4.3 Resource assessment
5 Selection and erection
5.1 General
Figure 5 \u2013 Micropower plant Type D: Multiple generator sets withmultiple power conditioning sub-systems micropower plant <\/td>\n<\/tr>\n
67<\/td>\n5.2 Selection requirements
5.2.1 Power quality
5.2.2 Generator set sizing <\/td>\n<\/tr>\n
68<\/td>\n5.2.3 Generator set type <\/td>\n<\/tr>\n
69<\/td>\n5.2.4 Derating factors
5.2.5 Starting system
Tables
Table 1 \u2013 Examples of derating factors for generator sets <\/td>\n<\/tr>\n
70<\/td>\n5.2.6 Control systems
5.2.7 Noise issues
5.2.8 Environmental issues
Table 2 \u2013 Generator set permitted noise levels <\/td>\n<\/tr>\n
71<\/td>\n5.3 Erection
5.3.1 Shipping
5.3.2 Design of the erection site <\/td>\n<\/tr>\n
73<\/td>\n5.3.3 Installation requirements <\/td>\n<\/tr>\n
75<\/td>\n6 Safety
6.1 General
6.2 Electrical issues
6.2.1 General requirements
6.2.2 Connection system to the application <\/td>\n<\/tr>\n
76<\/td>\n6.2.3 Power cables
6.2.4 Neutral system
6.2.5 Earthing
Table 3 \u2013 Cross-section of power cables <\/td>\n<\/tr>\n
77<\/td>\n6.2.6 Overcurrent protection
6.2.7 Residual Current Protection Device (RCD)
6.2.8 Isolating devices
6.3 Mechanical issues
6.3.1 Vibration
6.3.2 Protection from mechanical damage <\/td>\n<\/tr>\n
78<\/td>\n6.3.3 Protection from moving parts
6.4 Thermal issues
6.5 Fire risk
7 Acceptance
7.1 General
7.2 Conformity of the generator set to the identification file
7.3 Conformity of the generator set system to the generator set specification (GS)
7.4 Acceptance process
7.4.1 Preparation of the generator set for commissioning <\/td>\n<\/tr>\n
79<\/td>\n7.4.2 Commissioning inspection of the generator set system
7.4.3 Commissioning tests of the generator set system <\/td>\n<\/tr>\n
80<\/td>\n7.4.4 Test file
8 Operation and maintenance
8.1 Access to the generator set
8.2 Operation process <\/td>\n<\/tr>\n
81<\/td>\n8.3 Monitoring
8.4 Maintenance schedule
9 Replacement <\/td>\n<\/tr>\n
82<\/td>\n10 Marking
10.1 General
10.2 Generator set
10.3 Engine <\/td>\n<\/tr>\n
83<\/td>\n10.4 Alternator
10.5 Shutdown apparatus
11 Documentation
11.1 General
11.2 Installation <\/td>\n<\/tr>\n
84<\/td>\n11.3 Operation
11.4 Inspection and maintenance <\/td>\n<\/tr>\n
85<\/td>\nAnnex A (informative)Generator set classification criteria
A.1 General
A.2 Functioning mode
A.3 Services provided
A.4 Application classes
Table A.1 \u2013 Classification of generator set services <\/td>\n<\/tr>\n
86<\/td>\nA.5 Lifespan
A.6 Generator set components design
A.6.1 Engine
Table A.2 \u2013 Common lifespan values <\/td>\n<\/tr>\n
87<\/td>\nA.6.2 Alternator
A.6.3 Starting systems
A.7 Configuration types <\/td>\n<\/tr>\n
88<\/td>\nA.8 Installation modes <\/td>\n<\/tr>\n
89<\/td>\nAnnex B (informative)Identification file
B.1 General
B.2 Electrical construction characteristics
B.3 Mechanical construction characteristics <\/td>\n<\/tr>\n
90<\/td>\nAnnex C (informative)Maintenance schedule
Table C.1 \u2013 Example of maintenance schedule <\/td>\n<\/tr>\n
91<\/td>\nAnnex D (informative)Example of commissioning records sheet <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Tracked Changes. Recommendations for renewable energy and hybrid systems for rural electrification – Generator set. Selection of generator sets for rural electrification systems<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2020<\/td>\n94<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":245703,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2641],"product_tag":[],"class_list":{"0":"post-245700","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-bsi","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/245700","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/245703"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=245700"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=245700"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=245700"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}