{"id":265269,"date":"2024-10-19T17:41:39","date_gmt":"2024-10-19T17:41:39","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-79812017\/"},"modified":"2024-10-25T13:38:13","modified_gmt":"2024-10-25T13:38:13","slug":"bs-79812017","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-79812017\/","title":{"rendered":"BS 7981:2017"},"content":{"rendered":"
This British Standard gives recommendations and guidance for the installation, dismantling maintenance and thorough examination of mast climbing work platforms (MCWPs), which are temporarily installed, powered and designed to be used by persons from which to carry out work. It also gives recommendations and guidance on the safe use of MCWPs.<\/p>\n
\nNOTE 1 The vertical moving component (work platform\/deck) of an MCWP is used to move persons and their equipment and materials for the work carried out from the work platform to and from a single point. This is one of the features that distinguish MCWPs from builders’ hoists.<\/p>\n<\/blockquote>\n
This British Standard does not give recommendations for:<\/p>\n
\n
- \n
dealing with the hazards involved in the manoeuvring, erection or dismantling, fixing or removal of any materials or equipment which are not part of the mast climbing work platform;<\/p>\n<\/li>\n
- \n
the handling of specific hazardous materials;<\/p>\n<\/li>\n
- \n
delivering persons and\/or materials to fixed landing levels; or<\/p>\n
\nNOTE 2 Equipment referred to as lifts, hoists or transport platforms is dealt with by other standards, including BS EN 12158\u20111 , BS EN 12159 and BS EN 81\u201143 .<\/p>\n<\/blockquote>\n<\/li>\n
- \n
mobile elevating work platforms (MEWPs) as defined in BS EN 280 , suspended access equipment as defined in BS EN 1808 or lifting tables as defined in BS EN 1570 (both parts).<\/p>\n<\/li>\n<\/ol>\n
PDF Catalog<\/h4>\n
\n
\n PDF Pages<\/th>\n PDF Title<\/th>\n<\/tr>\n \n 5<\/td>\n Foreword <\/td>\n<\/tr>\n \n 7<\/td>\n 1 Scope
2 Normative references
3 Terms and definitions <\/td>\n<\/tr>\n\n 11<\/td>\n Figure 1 \u2014 Example single mast mobile MCWP <\/td>\n<\/tr>\n \n 12<\/td>\n Figure 2 \u2014 Twin mast MCWP illustrating one fixed and one moveable chassis <\/td>\n<\/tr>\n \n 13<\/td>\n Figure 3 \u2014 Typical mast tie arrangements
4 Hazards associated with MCWP working <\/td>\n<\/tr>\n\n 14<\/td>\n Table 1 \u2014 Typical hazards associated with the operation of MCWPs <\/td>\n<\/tr>\n \n 22<\/td>\n 5 Specification, installation planning, erection and dismantling of MCWPs
5.1 General <\/td>\n<\/tr>\n\n 23<\/td>\n 5.2 Responsibilities of appointed person (supplier)
6 Management and control of MCWP operation
6.1 General <\/td>\n<\/tr>\n\n 24<\/td>\n 6.2 Responsibilities of the appointed person (user)
7 Personnel and training
7.1 Selection
7.2 Fitness to work <\/td>\n<\/tr>\n\n 25<\/td>\n 7.3 Minimum attributes of personnel
7.4 Training arrangements <\/td>\n<\/tr>\n\n 26<\/td>\n Table 2 \u2014 Mast climbing work platform training needs analysis <\/td>\n<\/tr>\n \n 30<\/td>\n 7.5 Familiarization <\/td>\n<\/tr>\n \n 31<\/td>\n Figure 4 \u2014 Example operator familiarization record <\/td>\n<\/tr>\n \n 32<\/td>\n 8 Planning of the installation
8.1 General
8.2 Planning <\/td>\n<\/tr>\n\n 33<\/td>\n 8.3 Method statement for erection, alteration and dismantling
9 Siting of MCWPs
9.1 General <\/td>\n<\/tr>\n\n 34<\/td>\n 9.2 Temporary works
9.3 Access to the platform at the boarding point <\/td>\n<\/tr>\n\n 35<\/td>\n 9.4 Traffic access
10 Installation
10.1 Installation personnel
10.2 Erection <\/td>\n<\/tr>\n\n 37<\/td>\n Figure 5 \u2014 Example load chart
Figure 6 \u2014 Symmetrical load <\/td>\n<\/tr>\n\n 38<\/td>\n Figure 7 \u2014 Asymmetric load
Figure 8 \u2014 Example mast climbing work platform operating instructions <\/td>\n<\/tr>\n\n 39<\/td>\n 10.3 Alteration
10.4 Dismantling
11 Operation, use, maintenance and inspection of MCWPs
11.1 Operation and use of MCWPs <\/td>\n<\/tr>\n\n 40<\/td>\n 11.2 Transfer of a mobile MCWP
11.3 Distribution of load
11.4 Pre-use checks
11.5 Weekly inspections <\/td>\n<\/tr>\n\n 41<\/td>\n 11.6 In-use checks
11.7 Maintenance of MCWPs
11.8 Use of safety harnesses <\/td>\n<\/tr>\n\n 42<\/td>\n Figure 9 \u2014 Example rescue plan <\/td>\n<\/tr>\n \n 45<\/td>\n 12 Thorough examination and testing of MCWPs
12.1 Frequency, scope and nature of thorough examination <\/td>\n<\/tr>\n\n 46<\/td>\n Table 3 \u2014 Summary of examinations, testing and documentation <\/td>\n<\/tr>\n \n 49<\/td>\n 12.2 Thorough examination report <\/td>\n<\/tr>\n \n 50<\/td>\n 13 Safety at the work site
13.1 Clearances and warning notices <\/td>\n<\/tr>\n\n 51<\/td>\n 13.2 Maintenance of barriers
13.3 Electrical hazards
13.4 Use with other plant
13.5 Removal of guardrails and toe boards
13.6 Rated load
13.7 Alterations and additional fixed loads <\/td>\n<\/tr>\n\n 52<\/td>\n 13.8 Tandem mountings and bridges between work platforms
13.9 Emergency contingency <\/td>\n<\/tr>\n\n 53<\/td>\n Annex A (informative)\u2002 Typical checklists for pre-use and weekly inspections <\/td>\n<\/tr>\n \n 54<\/td>\n Figure A.1 \u2014 Example MCWP pre-use checklist <\/td>\n<\/tr>\n \n 55<\/td>\n Figure A.2 \u2014 Example MCWP weekly checklist <\/td>\n<\/tr>\n \n 56<\/td>\n Annex B (informative)\u2002 Typical checklists for thorough examinations <\/td>\n<\/tr>\n \n 58<\/td>\n Figure B.1 \u2014 Example report of thorough examination
Annex C (informative)\u2002 Thorough examination <\/td>\n<\/tr>\n\n 60<\/td>\n Annex D (normative)\u2002 Scope and nature of the thorough examination <\/td>\n<\/tr>\n \n 61<\/td>\n Annex E (informative)\u2002 Thorough examination checklist <\/td>\n<\/tr>\n \n 62<\/td>\n Figure E.1 \u2014 Example checklist for thorough examination <\/td>\n<\/tr>\n \n 63<\/td>\n Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Code of practice for the installation, maintenance, thorough examination and safe use of mast climbing work platforms (MCWPs)<\/b><\/p>\n
\n\n
\n Published By<\/td>\n Publication Date<\/td>\n Number of Pages<\/td>\n<\/tr>\n \n BSI<\/b><\/a><\/td>\n 2017<\/td>\n 66<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":265271,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[838,2641],"product_tag":[],"class_list":{"0":"post-265269","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-53-020-99","7":"product_cat-bsi","9":"first","10":"instock","11":"sold-individually","12":"shipping-taxable","13":"purchasable","14":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/265269","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/265271"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=265269"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=265269"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=265269"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}