{"id":386073,"date":"2024-10-20T03:33:43","date_gmt":"2024-10-20T03:33:43","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bsi-pd-cen-clc-tr-17603-20-022021\/"},"modified":"2024-10-26T06:29:34","modified_gmt":"2024-10-26T06:29:34","slug":"bsi-pd-cen-clc-tr-17603-20-022021","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bsi-pd-cen-clc-tr-17603-20-022021\/","title":{"rendered":"BSI PD CEN\/CLC\/TR 17603-20-02:2021"},"content":{"rendered":"
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
2<\/td>\n | undefined <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | 1 Scope <\/td>\n<\/tr>\n | ||||||
9<\/td>\n | 2 References <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | 3 Terms, definitions and abbreviated terms 3.1 Terms from other documents 3.2 Terms specific to the present document <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 3.3 Abbreviated terms <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 4 Cell or battery testing 4.1 Introduction <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 4.2 Test documentation 4.2.1 Test plan and test procedures 4.2.2 Test report <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 4.3 Tests 4.3.1 Initial electrical characterisation tests 4.3.2 Standard capacity and energy measurements 4.3.3 Internal resistance measurement <\/td>\n<\/tr>\n | ||||||
20<\/td>\n | 4.3.4 AC impedance measurement 4.3.5 Self-discharge test 4.3.6 Charge retention test 4.3.7 Cell rate capability 4.3.8 Cell EMF measurement <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 4.3.9 Battery magnetic moment measurement 4.3.10 Battery corona testing 4.4 Environmental tests 4.4.1 Objectives 4.4.2 Mechanical tests: vibration (low level sine, random, sine) and shock <\/td>\n<\/tr>\n | ||||||
22<\/td>\n | 4.4.3 Thermal vacuum test 4.4.4 Leak test <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 4.4.5 Hermeticity test (Helium test) 4.4.6 Radiation test 4.5 Life tests 4.5.1 Objectives 4.5.2 Calendar tests (survivability test) 4.5.3 Cycling tests 4.5.3.1 General <\/td>\n<\/tr>\n | ||||||
24<\/td>\n | 4.5.3.2 Constant DoD or DoDE 4.5.3.3 Mission profile, including micro-cycling (ripple) <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 4.5.3.4 Real time tests 4.5.3.5 Accelerated tests 4.5.3.6 Wear-out tests <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 4.6 Safety tests 4.6.1 Objectives 4.6.2 Overcharge 4.6.3 Overdischarge <\/td>\n<\/tr>\n | ||||||
28<\/td>\n | 4.6.4 Short-circuit test 4.6.4.1 Objective 4.6.4.2 External short-circuit 4.6.4.3 Internal short-circuit 4.6.5 Vent and burst tests 4.6.5.1 Objectives 4.6.5.2 Vent test 4.6.5.3 Burst test 4.6.6 Protective devices <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 4.7 Storage, handling, transport, AIT 4.7.1 General 4.7.2 Storage and maintenance conditions 4.7.3 Handling 4.7.4 Transport 4.7.5 Assembly Integration Test (AIT) <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 5 Test applicability matrix <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" Space engineering. Li-ion battery testing handbook<\/b><\/p>\n |