{"id":399846,"date":"2024-10-20T04:45:45","date_gmt":"2024-10-20T04:45:45","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-c57-12-91-2011\/"},"modified":"2024-10-26T08:33:48","modified_gmt":"2024-10-26T08:33:48","slug":"ieee-c57-12-91-2011","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-c57-12-91-2011\/","title":{"rendered":"IEEE C57.12.91-2011"},"content":{"rendered":"
Revision Standard – Superseded. This revision addresses substantive changes to Clause 5, 10 and 11 This revision addresses substantive changes to Clause 5, Clause 10, and Clause 11 of IEEE Std C57.12.91-2001 to reflect current practice in the testing procedures of dry-type transformers. This revision does not address transformer requirements and specific test criteria; rather they are contained in appropriate standards such as IEEE Std C57.12.01 or in user specifications.<\/p>\n
PDF Pages<\/th>\n | PDF Title<\/th>\n<\/tr>\n | ||||||
---|---|---|---|---|---|---|---|
1<\/td>\n | Cover \n <\/td>\n<\/tr>\n | ||||||
3<\/td>\n | Title page \n <\/td>\n<\/tr>\n | ||||||
6<\/td>\n | Introduction Notice to users Laws and regulations Copyrights Updating of IEEE documents <\/td>\n<\/tr>\n | ||||||
7<\/td>\n | Errata Interpretations Patents <\/td>\n<\/tr>\n | ||||||
8<\/td>\n | Participants <\/td>\n<\/tr>\n | ||||||
10<\/td>\n | Contents <\/td>\n<\/tr>\n | ||||||
13<\/td>\n | Important notice \n 1. Overview 1.1 Scope 1.2 Purpose <\/td>\n<\/tr>\n | ||||||
14<\/td>\n | 2. Normative references 3. Definitions 4. General 4.1 Test definitions 4.2 Test requirements 4.3 Test sequence <\/td>\n<\/tr>\n | ||||||
15<\/td>\n | 4.4 Instrumentation 5. Resistance measurements 5.1 General 5.2 Measurements <\/td>\n<\/tr>\n | ||||||
16<\/td>\n | 5.3 Determination of cold temperature <\/td>\n<\/tr>\n | ||||||
17<\/td>\n | 5.4 Conversion of resistance measurements 5.5 Resistance measurement methods <\/td>\n<\/tr>\n | ||||||
18<\/td>\n | 5.6 Resistance measurement connections and reporting <\/td>\n<\/tr>\n | ||||||
19<\/td>\n | 6. Polarity and phase-relation tests 6.1 Subtractive and additive polarity <\/td>\n<\/tr>\n | ||||||
21<\/td>\n | 6.2 Polarity tests\u2014single-phase transformers <\/td>\n<\/tr>\n | ||||||
23<\/td>\n | 6.3 Polarity and phase-relation tests\u2014polyphase transformers <\/td>\n<\/tr>\n | ||||||
26<\/td>\n | 7. Ratio tests 7.1 General <\/td>\n<\/tr>\n | ||||||
27<\/td>\n | 7.2 Tolerances for ratio 7.3 Ratio test methods <\/td>\n<\/tr>\n | ||||||
29<\/td>\n | 8. No-load losses and excitation current 8.1 General <\/td>\n<\/tr>\n | ||||||
30<\/td>\n | 8.2 No-load loss test <\/td>\n<\/tr>\n | ||||||
32<\/td>\n | 8.3 Waveform correction of no-load losses 8.4 Determination of excitation (no-load) current <\/td>\n<\/tr>\n | ||||||
33<\/td>\n | 9. Load losses and impedance voltage 9.1 General 9.2 Factors affecting the values of load losses and impedance voltage <\/td>\n<\/tr>\n | ||||||
34<\/td>\n | 9.3 Tests for measuring load losses and impedance voltage <\/td>\n<\/tr>\n | ||||||
41<\/td>\n | 9.4 Calculation of load losses and impedance voltage from test data <\/td>\n<\/tr>\n | ||||||
43<\/td>\n | 9.5 Zero-phase-sequence impedance <\/td>\n<\/tr>\n | ||||||
45<\/td>\n | 10. Dielectric tests 10.1 Factory dielectric tests <\/td>\n<\/tr>\n | ||||||
47<\/td>\n | 10.2 Dielectric tests in the field 10.3 Applied-voltage tests <\/td>\n<\/tr>\n | ||||||
48<\/td>\n | 10.4 Induced-voltage tests <\/td>\n<\/tr>\n | ||||||
49<\/td>\n | 10.5 Impulse tests <\/td>\n<\/tr>\n | ||||||
52<\/td>\n | 10.6 Impulse tests on transformer neutrals 10.7 Detection of failure during impulse test <\/td>\n<\/tr>\n | ||||||
53<\/td>\n | 10.8 Insulation-power-factor tests <\/td>\n<\/tr>\n | ||||||
54<\/td>\n | 10.9 Insulation-resistance tests <\/td>\n<\/tr>\n | ||||||
56<\/td>\n | 11. Temperature test 11.1 General 11.2 Ambient temperature measurements <\/td>\n<\/tr>\n | ||||||
57<\/td>\n | 11.3 Surface temperature measurements 11.4 Cold-resistance measurements 11.5 Hot-resistance measurement <\/td>\n<\/tr>\n | ||||||
58<\/td>\n | 11.6 Calculation of average winding temperature rise <\/td>\n<\/tr>\n | ||||||
59<\/td>\n | 11.7 Correction factors <\/td>\n<\/tr>\n | ||||||
61<\/td>\n | 11.8 Temperature rise test loading methods <\/td>\n<\/tr>\n | ||||||
67<\/td>\n | 12. Short-circuit tests 12.1 Scope 12.2 Short-circuit testing techniques <\/td>\n<\/tr>\n | ||||||
73<\/td>\n | 12.3 Test requirements <\/td>\n<\/tr>\n | ||||||
74<\/td>\n | 12.4 Test procedure <\/td>\n<\/tr>\n | ||||||
77<\/td>\n | 12.5 Failure detection techniques <\/td>\n<\/tr>\n | ||||||
79<\/td>\n | 12.6 Analysis of test results and visual inspection <\/td>\n<\/tr>\n | ||||||
82<\/td>\n | 12.7 Proof of satisfactory performance <\/td>\n<\/tr>\n | ||||||
83<\/td>\n | 12.8 Required information for transformer short-circuit test reports 13. Audible sound-level measurements 13.1 General <\/td>\n<\/tr>\n | ||||||
84<\/td>\n | 13.2 Instrumentation 13.3 Test conditions <\/td>\n<\/tr>\n | ||||||
85<\/td>\n | 13.4 Microphone positions <\/td>\n<\/tr>\n | ||||||
86<\/td>\n | 13.5 Sound level measurements 13.6 Optional-frequency analysis measurements <\/td>\n<\/tr>\n | ||||||
88<\/td>\n | 14. Mechanical design tests 14.1 Components involved in lifting or moving 14.2 Tests of sealed dry-type transformers <\/td>\n<\/tr>\n | ||||||
89<\/td>\n | 15. Calculated data 15.1 Reference temperature 15.2 Total losses 15.3 Efficiency 15.4 Voltage regulation <\/td>\n<\/tr>\n | ||||||
91<\/td>\n | 16. Minimum information to be included in certified test data 16.1 Order data 16.2 Rating data 16.3 Test data <\/td>\n<\/tr>\n | ||||||
92<\/td>\n | 16.4 Calculated data 16.5 Certification statement and approval <\/td>\n<\/tr>\n | ||||||
93<\/td>\n | Annex A (informative) Bibliography \n <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":" IEEE Standard Test Code for Dry-Type Distribution and Power Transformers<\/b><\/p>\n |