{"id":437894,"date":"2024-10-20T08:01:17","date_gmt":"2024-10-20T08:01:17","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/ieee-1793-2012\/"},"modified":"2024-10-26T15:04:26","modified_gmt":"2024-10-26T15:04:26","slug":"ieee-1793-2012","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/ieee\/ieee-1793-2012\/","title":{"rendered":"IEEE 1793-2012"},"content":{"rendered":"

New IEEE Standard – Active. Careful consideration of the physical and electrical characteristics of overhead lines and transmission cables are necessary in designing a transition structure between the two systems. Environmental and social factors also play a role in designing a transition. By considering the factors contained in this guide, the user will be better able to design a suitable transition that balances cost, operability, environmental factors, and future flexibility.<\/p>\n

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
1<\/td>\nIEEE Std 1793-2012 Front Cover <\/td>\n<\/tr>\n
3<\/td>\nTitle page <\/td>\n<\/tr>\n
6<\/td>\nNotice to users
Laws and regulations
Copyrights
Updating of IEEE documents
Errata
Patents <\/td>\n<\/tr>\n
7<\/td>\nIntroduction <\/td>\n<\/tr>\n
8<\/td>\nParticipants <\/td>\n<\/tr>\n
10<\/td>\nContents <\/td>\n<\/tr>\n
11<\/td>\nImportant Notice
1. Overview
1.1 Scope <\/td>\n<\/tr>\n
12<\/td>\n1.2 Purpose
2. Normative references
3. Planning <\/td>\n<\/tr>\n
13<\/td>\n3.1 Site selection <\/td>\n<\/tr>\n
18<\/td>\n3.2 System impacts <\/td>\n<\/tr>\n
25<\/td>\n4. Design
4.1 Monopole structure layout\/design <\/td>\n<\/tr>\n
31<\/td>\n4.2 Transition site design <\/td>\n<\/tr>\n
32<\/td>\n4.3 Other design considerations <\/td>\n<\/tr>\n
36<\/td>\n4.4 Structure installation
4.5 Cable installation <\/td>\n<\/tr>\n
37<\/td>\n4.6 Accessories installation <\/td>\n<\/tr>\n
38<\/td>\n4.7 Commissioning
4.8 Operational\/Maintenance (O&M) considerations <\/td>\n<\/tr>\n
39<\/td>\n5. Conclusion <\/td>\n<\/tr>\n
40<\/td>\nAnnex A (informative) Bibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

IEEE Guide for Planning and Designing Transition Facilities between Overhead and Underground Transmission Lines<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
IEEE<\/b><\/a><\/td>\n2012<\/td>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":437899,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2644],"product_tag":[],"class_list":{"0":"post-437894","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-ieee","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/437894","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/437899"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=437894"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=437894"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=437894"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}