{"id":451365,"date":"2024-10-20T09:17:26","date_gmt":"2024-10-20T09:17:26","guid":{"rendered":"https:\/\/pdfstandards.shop\/product\/uncategorized\/bs-iso-14300-12023\/"},"modified":"2024-10-26T17:19:08","modified_gmt":"2024-10-26T17:19:08","slug":"bs-iso-14300-12023","status":"publish","type":"product","link":"https:\/\/pdfstandards.shop\/product\/publishers\/bsi\/bs-iso-14300-12023\/","title":{"rendered":"BS ISO 14300-1:2023"},"content":{"rendered":"

PDF Catalog<\/h4>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
PDF Pages<\/th>\nPDF Title<\/th>\n<\/tr>\n
2<\/td>\nNational foreword <\/td>\n<\/tr>\n
8<\/td>\nForeword <\/td>\n<\/tr>\n
9<\/td>\nIntroduction <\/td>\n<\/tr>\n
11<\/td>\n1 Scope
2 Normative references
3 Terms and definitions <\/td>\n<\/tr>\n
12<\/td>\n4 Abbreviated terms
5 Project management specification and plan
5.1 General <\/td>\n<\/tr>\n
13<\/td>\n5.2 Project management specification
5.3 Project management plan <\/td>\n<\/tr>\n
14<\/td>\n6 Work breakdown structure (WBS)
6.1 General <\/td>\n<\/tr>\n
15<\/td>\n6.2 Objectives
6.3 Responsibility and authority for development
6.4 Rules for defining the WBS
6.4.1 Main aspects
6.4.2 Function tree <\/td>\n<\/tr>\n
16<\/td>\n6.4.3 Product tree
6.4.4 Tasks
6.5 Management rules for changes <\/td>\n<\/tr>\n
17<\/td>\n7 Project organization
7.1 General
7.2 Principles
7.3 Organizational requirements
7.3.1 General <\/td>\n<\/tr>\n
18<\/td>\n7.3.2 Requirements
7.4 Information and communication
7.4.1 Information circuits
7.4.2 Communication requirements
7.4.3 Protection of information <\/td>\n<\/tr>\n
19<\/td>\n7.4.4 Progress reports
7.4.5 Customer’s prerogatives
7.4.6 Action items management
7.4.7 Technical and management indicators <\/td>\n<\/tr>\n
20<\/td>\n8 Project phasing and planning
8.1 General
8.2 Project phasing
8.2.1 Principles
8.2.2 Mission analysis phase (phase 0 or pre-phase A) <\/td>\n<\/tr>\n
21<\/td>\n8.2.3 Feasibility phase (phase A)
8.2.4 Definition phase (phase B) <\/td>\n<\/tr>\n
23<\/td>\n8.2.5 Development (phase C) and production (phase D) phases <\/td>\n<\/tr>\n
24<\/td>\n8.2.6 Utilization phase (phase E) <\/td>\n<\/tr>\n
25<\/td>\n8.2.7 Disposal phase (phase F)
8.3 Product stages \u2014 Associated processes and documents
8.3.1 General
8.3.2 Functional stage
8.3.3 Specified stage <\/td>\n<\/tr>\n
27<\/td>\n8.3.4 Designed stage <\/td>\n<\/tr>\n
28<\/td>\n8.3.5 As-built stage
8.3.6 Use stage
9 Cost and schedule management
9.1 General <\/td>\n<\/tr>\n
29<\/td>\n9.2 Cost management
9.2.1 Principles <\/td>\n<\/tr>\n
30<\/td>\n9.2.2 Optimization
9.2.3 Cost estimates
9.2.4 Cost monitoring <\/td>\n<\/tr>\n
31<\/td>\n9.3 Schedule management
9.3.1 Principles
9.3.2 Task sequencing <\/td>\n<\/tr>\n
32<\/td>\n9.3.3 Deviation analysis \u2014 Trend analysis
9.4 Evaluation after completion
10 Configuration management
10.1 General
10.2 Configuration management planning <\/td>\n<\/tr>\n
33<\/td>\n10.3 Configuration identification
10.3.1 Product tree and selection of configuration items
10.3.2 Documentation of configuration items
10.3.3 Establishment of configuration baselines
10.4 Configuration status accounting
10.5 Configuration control
10.5.1 General
10.5.2 Configuration baselines <\/td>\n<\/tr>\n
34<\/td>\n10.5.3 Configuration control board
10.6 Change control
10.6.1 Change classification
10.6.2 Change approval
10.7 Configuration status controlling
10.8 Configuration audit
11 Integrated logistics support
11.1 Objectives <\/td>\n<\/tr>\n
35<\/td>\n11.2 Scheduling aspects
11.3 ILS management
11.3.1 ILS integration into the project <\/td>\n<\/tr>\n
36<\/td>\n11.3.2 Communication
11.3.3 Design, development and maintenance of support elements
11.3.4 Follow-up of the system in service
11.3.5 ILS organization
12 Documentation and information management
12.1 Objective
12.2 Application conditions <\/td>\n<\/tr>\n
37<\/td>\n12.3 List of documents to be produced
12.4 List of applicable and reference documents
12.5 Master list of documents
12.6 Document identification <\/td>\n<\/tr>\n
38<\/td>\n12.7 Drafting of documents
12.8 Document authorization
12.8.1 General rules
12.8.2 Submission phases <\/td>\n<\/tr>\n
39<\/td>\n12.8.3 Document changes
12.9 Availability of documentation
12.9.1 General
12.9.2 Classification, filing and storage
12.9.3 Confidentiality <\/td>\n<\/tr>\n
40<\/td>\n13 Risk management
13.1 General <\/td>\n<\/tr>\n
41<\/td>\n13.2 Critical items control <\/td>\n<\/tr>\n
42<\/td>\n14 Project closure
14.1 General
14.2 Scheduled project closure
14.3 Unscheduled closure of the project <\/td>\n<\/tr>\n
43<\/td>\nAnnex A (informative) Management framework for space systems standards <\/td>\n<\/tr>\n
44<\/td>\nBibliography <\/td>\n<\/tr>\n<\/table>\n","protected":false},"excerpt":{"rendered":"

Space systems. Programme management – Structuring of a project<\/b><\/p>\n\n\n\n\n
Published By<\/td>\nPublication Date<\/td>\nNumber of Pages<\/td>\n<\/tr>\n
BSI<\/b><\/a><\/td>\n2023<\/td>\n46<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n","protected":false},"featured_media":451376,"template":"","meta":{"rank_math_lock_modified_date":false,"ep_exclude_from_search":false},"product_cat":[2641],"product_tag":[],"class_list":{"0":"post-451365","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-bsi","8":"first","9":"instock","10":"sold-individually","11":"shipping-taxable","12":"purchasable","13":"product-type-simple"},"_links":{"self":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product\/451365","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/types\/product"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media\/451376"}],"wp:attachment":[{"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/media?parent=451365"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_cat?post=451365"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/pdfstandards.shop\/wp-json\/wp\/v2\/product_tag?post=451365"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}